top of page

LATEST TAILINGS NEWS
From Across the Earth.
David Smirk - @AuManufacturing Conversations tells the story of how innovation, curiosity, and commitment to sustainability are reshaping the future of mining — one tailings dam at a time.Phibion
00:00 / 53:34
Search


Meet Phibion at Tailings and Mine Waste 2026 — Booth #52
November 8–11, 2026 | Westminster, Colorado, USA How can mining companies improve tailings consolidation, recover more water and make better use of existing tailings storage capacity? At Tailings and Mine Waste 2026, Phibion will showcase its approach to tailings optimization, dewatering and risk reduction, powered by its proprietary Accelerated Mechanical Consolidation (AMC™) process and MudMaster® technology. Join us at Booth #52 to discuss how in-situ tailings dewatering a
johncastiblanco
3 days ago3 min read


Tailings Dewatering: Methods, Benefits and Phibion’s AMC Technology
Discover tailings dewatering methods and how Phibion’s AMC and MudMaster technology improve tailings consolidation, water recovery and storage efficiency.
johncastiblanco
Oct 146 min read


Phibion Wins 2026 Queensland Export Award | Tailings Innovation
Phibion wins Queensland’s 2026 Resources and Energy Export Award, recognising its Australian mining technology for tailings optimisation, dewatering and risk reduction.
johncastiblanco
Oct 144 min read


Accelerated Mechanical Consolidation vs Filter Press: Which Tailings Dewatering Technology is Right for Your Mine?
Accelerated Mechanical Consolidation vs Filter Press: Tailings Dewatering Guide
johncastiblanco
Aug 527 min read


Partnership Beyond Technology: How Collaboration Helped Secure the Future of a Zinc Operation
Tailings Storage Challenges Solved: Nexa Zinc & Phibion Partnership Success Story
johncastiblanco
Jun 102 min read


In situ foundation improvement for upstream raising of embankments using dried tailings
In situ foundation improvement for upstream raising of embankments using dried tailings
johncastiblanco
May 271 min read


Reprocessing tailings at Worsley Alumina to unlock value
At Worsley Alumina, bauxite residue—the waste generated during the alumina production process—is deposited in tailings storage facilities (T
johncastiblanco
Apr 102 min read
bottom of page