CASE STUDIES

Proven outcomes.

Lasting benefits.

MINE CLOSURE

Coal

 

Coal fines are high in clay and resist efforts to dewater. When applied to closing a coal fines dam AMC operations can deliver:

  • A trafficable surface within 16 weeks plus a maturation period (that varys from site to site and usually several months). Once complete the capping process can commence; and 

  • A final coal fines density approaching the liquid limit and strengths >10 kPa.

 

MINE CLOSURE

Mineral Sands

 

Mineral sand tailings are high in clay and resist efforts to dewater. The low angle of repose is also a contributing and complicating factor.  When applied to closing fine mineral sand tailings dam AMC operations can deliver:

  • A trafficable surface within 16 weeks plus a maturation period (that varys from site to site and usually several months). Once complete the capping process can commence; and

  • A final fine mineral sand tailings strength at depth >10 kPa after the maturation period.

 

Australia
Phibion Pty Ltd

158 Benjamin Place

Lytton, 4178

Brisbane, Queensland, Australia

Brazil
Phibion Brasil
Tecnologia e Inovação para Mineração Ltda

Mangabeira street, 392 - Santo Antonio

Belo Horizonte, Minas Gerias, Brazil

Jamaica
Phibion Pty Ltd

3 Haughton Avenue

Kingston 10, Jamaica

Mailing
Phibion Pty Ltd

Mailing PO Box 4290

Gumdale, 4154

Queensland, Australia

Chile
Phibion Chile SpA

Av. Vitacura 5250, Of. 802. – Vitacura

Santiago, Chile