LAND RECLAMATION

Dredging

 

Dredged materials usually contain a high proportion of marine clays. As an unflocculated material with a low angle of repose it resists dewatering efforts. When applied to drudged materials AMC operations can deliver:

  • Rapid consolidation to very high density within 7 – 12 weeks;

  • Reduction in deposited volumes of up to 30%; and

  • Sufficient strength such that subsequent hydraulic deposition of capping sands can be retained with no loss. Once capping is complete this sand can be recovered and re-used reducing costs and environmental footprint.

 

Australia
Phibion Pty Ltd

158 Benjamin Place

Lytton, 4178

Brisbane, Queensland, Australia

Brazil
Phibion Brasil
Tecnologia e Inovação para Mineração Ltda

Mangabeira street, 392 - Santo Antonio

Belo Horizonte, Minas Gerias, Brazil

Jamaica
Phibion Pty Ltd

3 Haughton Avenue

Kingston 10, Jamaica

Mailing
Phibion Pty Ltd

Mailing PO Box 4290

Gumdale, 4154

Queensland, Australia

Chile
Phibion Chile SpA

Av. Vitacura 5250, Of. 802. – Vitacura

Santiago, Chile